Works carried out in General Contractor status. Rezistance structure, electrical, plumbing, heating, ventilation and air conditioning, gas, interior and exterior finishing works were done. The building is arranged on 5 floors B + GF + 3S, with a developed surface of 3,100 sqm and hall closures on metal structure with sandwich panels with a surface of 1,400 sqm.
