Construction of production and storage space required for Agricultural Products Processing Technology.
The following works were done in General Contractor status: construction of the metallic hall with sandwich panel closings, interior finishing works, construction of special refrigerating rooms for storage of meat and dairy products, electrical installations, plumbing, ventilation and air conditioning, gas and inert gas, systematization and exterior landscaping.
The project included the stabilization of the warehouse site, and for this it was executed a reinforced concreteretaining wall with a height of 5 m.