Demolition of existing building with keeping, rehabilitation and consolidation of historic wall in the form of Z, which remained embedded in the new construction executed successfully combining modernist vision with the “old” appearance of the wall. The building is arranged on 3 floors, B + GF + F with a developed surface of 3,400 sqm. This construction project was executed as General Contractor containing structural works, electrical installation, plumbing, heating, ventilation and air conditioning, gas, interior and exterior works. Exterior design: landscaping works, fountain, stone cube pavings, parking, stabilization of slopes, including grassing.