Belle Residence Housing Complex, Traian street – Cluj-Napoca

The building is a multifunctional residence, developed on B+GF+5F+ withdrawn floor, with a surface of 1.962 sqm, has a parking in the basement, commercial spaces at ground floor level and apartment flats at the higher storeys.

Decorint Team executed the consolidation of the terrain through a support structure consisting of reinforced concrete piles. According to the project, the constructive solution of the infrastructure was a “rigid sealed box”, while the superstructure is composed of monolith reinforced concrete, diaphragms and columns with thick slab floors.

The external closures were executed with brick masonry, the exterior finishes with thermo insulating system, decorative plasters, ventilated facades of HPL sheets, special finishing with ceramic tiles, PVC joinery with double glazing. The roof terrace was finished with thermo and hydro insulation.

Decorint Team also executed the interior finishing: rendering, plastering, painting, flooring with ceramic tiles, metal railings, metal entrance doors and PVC joinery.

Built in 2018 June – 2019 May.

Designed: A&A STUDIO PROIECT SRL – Cluj Napoca